SPAIN / PUERTO DE ALMERÍA (ALMERÍA)


Technical Information
| NOMINAL POWER INSTALLED: |
95 kW
|
| POWER PEAK INSTALLED: | 100 kWp |
| BUDGET: | €470k |
| DURATION: | 3 months |
| TECHNOLOGY: | mono c-Si /Fixed |
| MODULES: | SHARP NUS0E3E 180 Wp |
| INVERTERS: | Ingecon Sun 100 kW |
| SUPPORT: |
Aluminium
|
| CONFIGURATION: | 20 Modules/string |
| ANNUAL OUTPUT: | 140,000 kWh |
| STATUS: | Finished |