SPAIN / Marcegoso (CÁDIZ)


Technical Information
| NOMINAL POWER INSTALLED: | 1,890 kW |
| POWER PEAK INSTALLED: | 2,200 kWp |
| BUDGET: | €12.4M |
| DURATION: | 4 months |
| TECHNOLOGY: | poly c-Si /Fixed |
| MODULES: | CSI 210 Wp |
| INVERTERS: | Helios Power 100 kW |
| SUPPORT: | Galvanized Steel |
| CONFIGURATION: | 22 Modules/String |
| ANNUAL OUTPUT: | 3,432,247 kWh |
| STATUS: | Finished |