ROOFTOP INSTALLATIONS / Puente Genil (CORDÓBA)

Technical Information
| NOMINAL POWER INSTALLED: | 90 kw |
| POWER PEAK INSTALLED: | 101,64 kw |
| BUDGET: | €158.000 |
| DURATION: | 3 months |
| TECHNOLOGY: | Tilted structure |
| MODULES: | JULI SOLAR JLS-60p - 220 wp |
| INVERTERS: | INGECON SUN 90 |
| SUPPORT: | Aluminum (design grs) |
| CONFIGURATION: | 22 modules/string |
| ANNUAL OUTPUT: | 137.500 kWh |
| STATUS: | Finished |