ROOFTOP INSTALLATIONS / lorqui 2 (MURCIA)

Technical Information

NOMINAL POWER INSTALLED:  90 kw
POWER PEAK INSTALLED: 101,2 kw
BUDGET: €658.000
DURATION: 3 months
TECHNOLOGY: Tilted structure and integrated
MODULES: JULI SOLAR JLS-60p (220 wp)
INVERTERS: SOLARMAX 100C (Limited to 90 kw)
SUPPORT: Aluminum (design grs)
CONFIGURATION: 20 modules/string
ANNUAL OUTPUT:  135.168 kWh
STATUS: Finished