ROOFTOP INSTALLATIONS / Arganda del Rey (madrid)

Technical Information
| NOMINAL POWER INSTALLED: | 60 kw |
| POWER PEAK INSTALLED: | 66,0 kw |
| BUDGET: | €264.000 |
| DURATION: | 3 months |
| TECHNOLOGY: | Tilted structure and integrated |
| MODULES: | Canadian solar 220 wp |
| INVERTERS: | ZIGOR (2 x 25 kw + 2 x 5 kw) |
| SUPPORT: | Aluminum (design grs) |
| CONFIGURATION: | 21 modules/string |
| ANNUAL OUTPUT: | 86.458 kWh |
| STATUS: | Finished |
