ROOFTOP INSTALLATIONS / Arganda del Rey (madrid)

Technical Information

NOMINAL POWER INSTALLED:  60 kw
POWER PEAK INSTALLED: 66,0 kw
BUDGET: €264.000
DURATION: 3 months
TECHNOLOGY: Tilted structure and integrated
MODULES: Canadian solar 220 wp
INVERTERS: ZIGOR (2 x 25 kw + 2 x 5 kw)
SUPPORT: Aluminum (design grs)
CONFIGURATION: 21 modules/string
ANNUAL OUTPUT:  86.458 kWh
STATUS: Finished