italy / gravina 9 (puglia)


Technical Information
| NOMINAL POWER INSTALLED: | 997 kW |
| POWER PEAK INSTALLED: | 997 kWp |
| BUDGET: | €3 M |
| DURATION: | 4 months |
| TECHNOLOGY: | poli c-Si /Fixed |
| MODULES: | SolarFun 230 Wp |
| INVERTERS: | SIEMENS 1000 TL |
| SUPPORT: | Aluminum |
| CONFIGURATION: | 22 Modules/string |
| ANNUAL OUTPUT: | 1,379,000kWh |
| STATUS: | Finished |
