Italy / DOGliola (Abruzzo)


Technical Information
| NOMINAL POWER INSTALLED: | 995.67kW |
| POWER PEAK INSTALLED: | 995.67kWp |
| BUDGET: | €3.45M |
| DURATION: | 4 months |
| TECHNOLOGY: | Mono Si/Fixed |
| MODULES: | Aide 185 |
| INVERTERS: | SIEMENS 1000 MS TL |
| SUPPORT: | Aluminum |
| CONFIGURATION: | 18 Modules/string |
| ANNUAL OUTPUT: | 1,360,090kWh |
| STATUS: | Finished |
